在以前的卢克教堂–建于1924年,是伯尔尼地区的一个装饰艺术风格的教堂,在70年代被完全毁坏–现在建了2个新家。为了保持地板没有支撑物,并接受来自教堂窗户的光线,上层公寓被挂在两层楼的前教堂里,成为一个混凝土盒子。

In the former Luke Chapel – built in 1924 as a Bernese district church in the Art Deco style and completely disfigured in the 70s – are now built 2 new homes. In order to keep the floor free of supports and receive the light oft he generous church window, the upper apartment was hanged as a concrete box in the two-storey former church.

曾经封闭的南面立面现在可以用宽大的窗框和悬臂阳台打开,通往宿舍和花园。

The once closed south facade could now be opened with generous sash windows and cantilevered balconies to the quarters and to the garden.

两套公寓都配备了简单的Minergie通风设备,它完美地整合在生活和睡眠空间的界面上,新鲜空气由线性扩散器引入。

Both apartments were equipped with a simple Minergie ventilation, which is perfectly integrated in the interface between living and sleeping spaces and fresh air is introduced by linear diffusers.

以前牧师在祭坛上布道,风琴师在那里弹奏赞美诗,现在是厨房–食物被煮熟,欢快的孩子们的笑声响起。

Where previously the pastor preached at the altar and where the organist played hymns, is now the kitchen – food is cooked and cheerful children’s laughter rings out.

Architects: Morscher Architects
Area : 500 m²
Year : 2013
Photographs :Dominique Uldry
City:BERNE
Country:Switzerland