意识到与新的全能运动馆(主要是篮球)的建设和现有体育馆的改造和扩建相关的挑战,我们的项目旨在回应项目的期望,并为运动员提供高质量的空间,无论是业余的、专业的、学者的还是观众的。

Aware of the challenges linked to the construction of the new Omnisport hall (predominantly basketball) and the renovation and extension of the existing gym, our project aims to respond to the programmatic expectations and proposes quality spaces for sportsmen, be they amateur, professionals, scholars, or spectators.

根据方案、环境和经济要求,该项目采用建筑和技术解决方案,旨在掌握这些限制。

Following the programmatic, environmental, and economical demands, the project uses architectural and technical solutions aiming to master those constraints.

同样,我们也特别关注与设备维护相关的未来投资。

Particular attention has equally been paid to future investments linked to the maintenance of equipment.

Architects: BPA ARCHITECTURE
Area: 2964 m²
Year: 2020
Photographs:Marie-Caroline LUCAT
Manufacturers: AutoDesk, AIRSUN, Arcelor Mittal, Autodesk Revit, Everlite Concept, MARTY SPORTS, ST GROUP
Associate Architect: Renaud Fabre
Roads And Utilities: SEIRI
Acoustic Engineer: Gui Jourdan
Fluids Engineer: P3G INGENIERIE
City: Castelnau-le-Lez
Country: France