这个项目是在回收20世纪初的旧院子的基础上产生的。新的办公室方案,安装在现有的房子里,保留了大部分的空间条件,期待着找回它的本质。它已被考虑到恢复和维护外墙,期待着重视它的遗产,这是附近的特点。

This project rises from the opportunity of recycling an old existing courtyard house from the early 20th century. The new program of offices, installed in the existing house, keeps most of its spatial conditions, looking forward to getting back its essence. It has been considered the recovery and maintenance of the façade, looking forward to valuing its heritage, which is characteristic of the neighborhood.

将一个新的室内院子纳入项目,使我们能够获得更好的照明和通风条件。拆除墙体的决定,以及夹层的加入,使我们能够配置不同类型的办公室。

The incorporation of a new interior yard to the project, allowed us to obtain better lighting and ventilation conditions. The decision of wall demolitions, and the incorporation of mezzanines, let us configure different types of offices.

Architects: Mola Kunst
Area : 254 m²
Year : 2021
Photographs :Marcos Guiponi
Manufacturers : Astori
Architects In Charge : Lorena Castelli, María Lezica
Collaborators : Maria Jose Milans, Massimiliano Fraga, Carlos Rey
Structural Engineer : Martín Rajchman
Sanitary Technician : Federico Estoup
Main Contractor: : Eldecor