一个面向未来的办公室。JJ Mack大厦(伦敦史密斯菲尔德市场Charterhouse街33号)由Lifschutz Davidson Sandilands为Helical plc和Ashby Capital设计,是一座漂亮的石墙建筑,将促进新的混合工作方式,有助于吸引和留住顶级人才。它位于法灵顿站(伊丽莎白线、泰晤士河连接线和伦敦地铁)的三分钟步行范围内,可以轻松前往伦敦的典型社区,门口有文化场所,还有很棒的餐厅和咖啡馆,可以在工作之余在这里吃午餐或喝饮料,场面很热闹。

An office for the future. The JJ Mack Building (33 Charterhouse Street, Smithfield Market, London), designed by Lifschutz Davidson Sandilands for Helical plc and Ashby Capital, is a handsome stone-clad building that will facilitate new hybrid ways of working and help lure and retain top talent. Located within a three-minute walk of Farringdon Station (Elizabeth Line, Thames Link, and London Underground), it offers an easy journey to a quintessential London neighborhood with cultural locations on its doorstep and great restaurants and cafés for lunch or drinks after work in a lively scene.

查特豪斯街的外墙与隔壁的伦敦港务局的小规模建筑相呼应。一个令人印象深刻的朝南的双高大厅欢迎员工和访客。美丽的石头地砖与青铜细节,英国再生木材和醒目的青铜接待台迎接您的到来。沿着东面的立面是一个中庭,从地面到五楼都有一个全高的艺术品,由(防火)玻璃封闭。这为建筑的低层提供了一个引人注目的、充满光线的周边环境。

The façade on Charterhouse Street responds to the smaller scale of the listed Port of London Authority building next door. An impressive south-facing, double-height lobby welcomes employees and visitors. Beautiful stone floor tiles with bronze detailing, English reclaimed timber and a striking bronze reception desk greet you on arrival. Along the east façade is an atrium with a full-height artwork from the ground to the fifth floor, enclosed by (fire-rated) glazing. This presents a striking, light-filled perimeter to the lower floors of the building.

一个太空时代的自行车公园,直接从法灵顿路自行车超级公路上进入,有426个车位(每5个住户有一个),还有两个维修站。骑自行车的人可以进入一套温泉质量的更衣区(672个储物柜,30个淋浴间),里面有吹风机、直发器和补充毛巾。大楼的设计是为了让租户在装修时达到白金级的WELL等级。各层楼的光线充沛,许多工作站可以看到圣保罗大教堂、碎片大厦和史密斯菲尔德市场。

A space-age bike park, accessed directly off Farringdon Road cycle super highway has 426 spaces (1 for every 5 occupants), and two repair stations. Cyclists descend into a suite of spa-quality changing areas (672 lockers, 30 showers), fully kitted with hairdryers, hair straighteners, and complementary towels. The building is designed to allow tenants to achieve Platinum WELL rating in their fit-out. Floors are flooded with light and many workstations have views of St Paul’s Cathedral, The Shard, and Smithfield Market.

在5、7、9层(共9127平方米),采用了强化的新风系统、低/无VOC涂料,并通过广阔的屋顶露台接触大自然。屋顶上住着两个蜜蜂群。这座建筑的建造以及操作它的先进技术都是面向未来的。九层楼中的每一层都有灵活的楼板和极少的柱子,允许新租户创造适合他们业务的布局。作为一个 “智能建筑”,它拥有先进的尖端技术,通过数字连接实现协作。

Incorporating enhanced fresh air systems, low/no VOC paint, and access to nature through expansive roof terraces on the 5th, 7th, and 9th floors (total 9,127 sqft). Two bee colonies live on the roof. The building is future-proof in its construction as well as the sophisticated technology that operates it. Each of the nine floors has flexible floor plates and remarkably few columns, allowing incoming tenants to create layouts that work for their businesses. A ‘smart building’, it has sophisticated and cutting-edge technology that enables collaboration through digital connectivity.

JJ Mack大厦获得了最高的可持续发展认证–在设计阶段就获得了英国建筑性能评估体系(BREEAM)的优秀认证;EPC A–由于在建筑中设计了可持续发展、智能和可再生技术。屋顶上的144块光电板将能源送回电网,并抵消了现场的电力消耗,一个开创性的水管理和循环系统减少了70%的自来水消耗。

The JJ Mack Building achieved the highest sustainability accreditations – BREEAM outstanding at the design stage; and EPC A – as a result of sustainable, intelligent, and renewable technologies designed into the building. 144 photo voltaic panels on the roof send energy back to the grid and offset on-site power consumption and a ground-breaking water management and recycling system reduces mains water consumption by up to 70%.

每层楼被分成四个区域,以运行局部的空气/冷却/加热/照明,以最大限度地提高舒适度和减少能源浪费,减少碳排放,并减少能源费用。所有这些都确保了LDS的JJ Mack大楼提供的工作空间能够确保办公室的

Each floor is split into four zones to run localized air/cooling/heating/lighting to maximize comfort and minimize energy wastage, reduce carbon emissions, and reduce energy bills. All of this ensures that LDS’ JJ Mack Building provides a workspace that will ensure the office of the future remains the center of the work ecosystem for a top-class workforce.

Architects: Lifschutz Davidson Sandilands
Area: 27805 m²
Year: 2022
Photographs:Jack Hobhouse
Manufacturers: Louis Poulsen
Lead Architects: Lifschutz Davidson Sandilands
Estructural Engineering: AKT II
Services Engineer: L&P Group
Landscape Architect: Bradley-Hole Schoenaich Landscape
Main Contractor: Mace
Project Manager: Avison Young
Sustainability: RES Design
Lighting Consultant: EQ2 Light
Client: Helical and Ashby Capital
Team: Paul Sandilands, Chris Waite, John Stimpson, Agnieszka Czapiewska , Richard Ward
Quantity Surveyor: Arcadis
Country: United Kingdom