LPA为加州门洛帕克的一所三层楼的公立高中设计,离Meta(Facebook)总部只有一个街区,重点是支持STEAM(科学、工程、艺术和数学)的新教学方式。该校园位于一个快速变化的工业区,占地两英亩,促进学生的选择、批判性思维和基于探究的学习,以及支持STEAM课程所需的跨学科教学。

LPA designs for a three-story public high school in Menlo Park, California, a block from Meta’s (Facebook) headquarters, focus on supporting new ways of teaching STEAM (science, engineering, art, and mathematics). Located on a two-acre site in a rapidly changing industrial area, the campus promotes student choice, critical thinking, and inquiry-based learning, as well as the interdisciplinary instruction necessary to support STEAM curriculums

TIDE校园–这个缩写代表了技术、创新、设计和工程–围绕着一个梯田式的中央庭院形成了一个保护性的三层 “U “型,由一个大楼梯连接。校园与人行道和街道相连接,将教育展示出来,并将学校与社区联系起来。泰达的设计是为了吸引与该地区的高科技公司合作,并支持与当地大学的直接联系。

The TIDE campus — the acronym stands for technology, innovation, design, and engineering —forms a protective three-story “U” around a terraced central courtyard, connected by a grand staircase. The campus connects to the sidewalk and street, putting education on display and tying the school to the neighborhood. TIDE was designed to attract partnerships with the area’s high-tech companies and support direct connections with local universities.

泰达的课程侧重于为学生的职业生涯做准备。学习环境支持基于项目的学习,不同形式的合作,以及团队教学。教室和实验室从标准模式扩大到1150平方英尺,每个教室和实验室都可以直接通向合作和户外空间。”智囊团 “和集合空间与每个学习工作室相关。可操作的墙壁、书写面和各种协作空间为学生提供了工作地点和方式的选择。空间的设计是为了促进三种不同类型的学习:合作、沉思和集中。

TIDE’s curriculum is focused on preparing students for careers. Learning environments support project-based learning, different forms of collaboration, and team teaching. Classrooms and labs were enlarged from the standard model to 1,150 square feet, each with direct access to a collab and outdoor space. “Think tanks” and huddle spaces are associated with every learning studio. Operable walls, writing surfaces, and a variety of collaboration spaces offer students choices for where and how to work. Spaces are designed to facilitate three different types of learning: collaboration, contemplation, and concentration.

每层楼都有一个带有教室和协作空间的 “学习工作室”,它可以根据项目的需要进行重新配置。指定的实验室侧重于科学、编码、设计、艺术和物理。每个空间的技术、工具和存储区域都可以重新配置,以支持不同层次的工作。

Each floor includes a “learning studio” with classroom and colab space, which can be reconfigured based on the needs of a project. Designated labs focus on science, coding, design, arts, and physics. Technology, tools, and storage areas in each space can be reconfigured to support different levels of work.

在每一层,学习空间通过车库式卷帘门延伸到室外学习环境。室外和室内的空间被设计成相互交织,共同工作。空间可用于头脑风暴或特定学科的实验。梯田式校园的大部分流通是在外部,促进健康的活动,与户外活动的联系,以及学生的参与。遮阳的平台提供了合作和社交的空间。

On every level, learning spaces spill into outdoor learning environments through garage-style rollup doors. The outdoor and indoor spaces are designed to intertwine and work together. Spaces can be used for brainstorming or experiments specific to the discipline. Most circulation on the terraced campus is exterior, promoting healthy activity, connections to outdoor activity, and student engagement. Shaded decks provide space to collaborate and socialize.

环境敏感性和可持续性被纳入校园的每个方面。没有学生的汽车停车场;鼓励学生步行、骑自行车或使用公共交通工具。完全通过被动的设计策略,能源使用比行业基准线减少了67%。校园内所有经常被占用的空间都能获得日光和视野。大面积的玻璃周围有网状的围栏,过滤直射的阳光,减少建筑的热增益。

Environmental sensitivity and sustainability are built into every aspect of the campus. There is no student parking for cars; students are encouraged to walk, bike, or use public transportation. Energy use was reduced by 67 percent from the industry baseline, entirely through passive design strategies. All of the regularly occupied spaces on campus have access to daylight and views. A mesh scrim surrounds large sections of glass, filtering direct sunlight and reducing the heat gain on the buildings.

Architects: LPA
Year : 2019
Photographs :Jason O’Rear Photography
Manufacturers : AutoDesk, Dri-Design, 3form, Arcadia Windows, ICI Scientific, PPG, Solatube
Structural Engineer Team : LPA
Landscape Architecture : LPA
Civil Engineering : LPA
MEP Engineering : LPA
Consultant Acoustics : CM Salter
Geotechnical Consulting : Corner Stone Earth
Lead Designer : Helen Pierce
Programming : Kate Mraw
Interior Designer : Kate Mraw
Landscape Designer : Kari Kikuta
Principal : Don Pender
Cost Estimation : Cummings Corp
Food Services : Webb Food Service
General Contractor : Arntz Construction
City : Menlo Park
Country : United States