该项目是在开普敦郊外的阿斯隆污水处理厂的一个新的鼓风机房综合楼。在一楼,该综合楼包括一个大型鼓风机房及其电机控制中心(MCC室)和空气管道,一个用于未来升级的反应器的MCC,地面工作人员的更衣室,一个洗衣房和商店。

The project is a new Blower House Complex on the Athlone Wastewater Treatment Works just outside Cape Town. On the Ground floor, the complex consists of a large blower room with its Motor Control Centre (MCC room) and air plenums, an MCC for the future upgrade’s reactors, locker rooms for the ground staff, a laundry room, and stores.

一楼的性质更偏向于文职,包括控制室、SCADA站、办公室、董事会议室、实验室和工作人员的设施。

The nature of the first floor is more clerical and includes the control room, SCADA station, offices, boardroom, laboratory, and staff amenities.

与鼓风机房成一定角度连接的是新的电力大楼,里面有四台大型柴油发电机及其相关设备,以便在停电的情况下运行整个工厂。

Connected at an angle to the blower house is the new electrical building which houses four large diesel generators and their associated plant to run the whole plant in case of a power outage.

Architects: SALT Architects
Area : 3470 m²
Year : 2022
Photographs :Southland Photography
Project Managers : Water & Wastewater Engineering
Civil Engineers : Water & Wastewater Engineering
Mechanical & Electrical Engineers : JGP Group
Structural Engineering : WA Structural Design
Building Contractor : Hiload Inyanga Construction
Bulk Earthworks Contractor : Amadla Construction
City : Cape Town
Country : South Africa