该建筑可以通过一个具有约束力的中央公共领域,即以前学校的操场进入。通过进一步打开一些窗户,我们加强了内部空间和这个广场之间的关系。通过在建筑的另一个地方做同样的事情,后面的区域被激活为一个与会议厅相连的绿色半公共空间。封闭的功能、储藏室、技术区域和卫生设施被组合在一个部分扩展的体量中。这是建筑的年轻化,最近的卫生设施扩建导致了这一点。

The building is accessible by a central binding public domain, the playground of the former school. By opening some windows further down we reinforce the relationship between interior spaces and this square. By doing the same at the other site of the building, the back area is activated as a green semi-public space linked with the meeting hall. The closed functions, the storeroom, the technical areas and the sanitary facilities are grouped in a partially extended volume. It is a rejuvenation of the building, where the recent sanitair extension gave rise to.

这个滑块的移动为会议中心的中心地带带来了光线,并在中央入口大厅提供了更多的空间。内部窗户可以俯瞰这个大厅,并将光线传播到邻近的空间。其他房间有一个开放的特点,可以完全用于会议中心的活动:厨房、会议室、会议厅和绘画学院。阁楼是为今天使用该建筑的需要而设计的。在未来,进一步的内部扩展仍然是可能的。

This slider movement brings light in the heart of the meeting centre and gives more space at the central entrance hall. Internal windows overlook this hall and spread the light into the adjacent spaces. The other rooms have an open character, and can be used fully for the activities of the meeting centre : kitchen, meeting room, meeting hall and drawing Academy. The attic is elaborated for what is needed to use the building today. Further inside extension is still possible in the future.

材料的选择是根据他们的生活圈分析来决定的。所使用的木材都有FSC标签:扩建部分的结构(地板、墙壁和屋顶),轻质内墙的结构,窗户,外墙护栏及其结构,地板和固定用的额外木条,隔离物。我们用纤维板做内墙,用Celit和OSB做扩展。厕所是用回收的雨水供应的。灯是节能的。供暖系统回收了排空气体的热量。通风系统对排出的脏空气的热量进行回收。我们采取了更好的隔离措施:我们把所有的窗户都换成了高隔离的玻璃,屋顶、地板和新墙都是隔离的。

Materials are choosen by the score at their circle of life analysis. The used wood is FSC-labelled : the structure of the extension (floors, walls and roof), the structure of the light interior walls, the windows, the façade coping and its structure, extra wooden bars for floors and for fixating,isolation. We used fibre boards for the interior walls, Celit and OSB for the extension. The toilets are supplied with recycled rain water. The lights are energy efficient. The heating system recuperates the heat of the evacuating gases. The ventilation system recuperates the heat of the dirty removed air. We took care of better isolation : we changed all windows in high isolating glass, the roofs, floors and new walls are isolated.

Architects: Atelier Tom Vanhee
Area: 616 m²
Year: 2011
Photographs: Filip Dujardin
Structural Engineer: S.C.E.S. nv
Contractor: Monument Vandekerckhove
Client:Gemeentebestuur Vleteren
City:Vleteren
Country:Belgium