这是一个绿地项目,在郊区的一块土地上建造一所音乐学校。机构的感觉是受到野蛮主义形式的启发。该项目以周围的绿化带为背景,界定了室内和室外之间的关系。自然光被用作流经空间的材料,这给了室内一种柔和的感觉,与砖块和混凝土的外表的硬度并列。

This is a greenfield project to house a music school on a suburban plot of land. The institutional feel is inspired by the Brutalist form. The project is contextualized by the view of a surrounding green belt that defines the relationship between the indoors and outdoors. Natural light is used as a material which flows through the space, which gives the interior a softness, that juxtaposes with the hardness of the brick and concrete exterior.

建筑形式被分为两个长方形块,中间的通道可以灵活使用。这些街区之间的双倍高度空间创造了庭院,在视觉上区分了这两个体块。铝框窗户和金属楼梯突出于建筑之外,这提供了一个独特的定义和对比,标志着建筑在景观上。

The built form is divided into two rectangular blocks with circulation in the middle for flexibility of use. Double height spaces between these blocks create courtyards that visually distinguish the two masses. Aluminum frame windows and a metal staircase protrude out of the building, which provides a unique definition and contrast that marks the building on the landscape.

工作室的主要理念是创造永恒的、可持续的设计,与此相一致的是使用耐用、持久的材料,这些材料对环境的影响很小。粉煤灰砖和粉煤灰混凝土砖有助于减少建筑的碳足迹。我们特别注意只使用特定的、所需数量的砖块,因为每块砖都是以垂直排列的方式堆叠在一起,一块在另一块上面。这就形成了一个有趣的网格,从而使这种简单的材料既能作为外立面,又能作为内墙的装饰。

In line with the studio’s key philosophy of creating timeless, sustainable design was the use of durable, long-lasting materials, which have a low environmental footprint. Fly ash bricks and fly ash concrete bricks help to reduce the carbon footprint of the construction. Special care was given to use only the specific, required number of bricks in an intentional manner, as each brick was stacked in vertical alignment with one over the other. This made for an interesting grid which in turn enabled the simple material to function as both the outer façade and the interior wall finish.

作为一个在大流行期间完成的项目,该工作室首次进行了远程工作。由于全国范围内的封锁导致了施工的停止,材料供应的中断和时间表的延迟,因此遇到了一些挫折;尽管有这些挑战,599还是按时完成了。

As a project completed during the pandemic, the studio worked remotely for the first time. Several setbacks were encountered as nation-wide lockdowns led to halts in construction, a break in supply of materials and delayed timelines; despite these challenges, 599 was completed in time.

Architects: Studio Organon
Area : 12500 ft²
Year : 2020
Photographs :Suryan // Dang
Manufacturers : Candor View, Jindal Mechno Bricks, Mitsubishi
Structural Consultant : Manjunath consultants
Principal Architect : Saurabh Dakshini
Design Team : Akshat Dayal, Subhash Ramisetty, Dilip Singh
City : Gurugram
Country : India