阿斯本社区学校在科罗拉多州伍迪克里克的山景环绕下,提供了一个独特和刺激的K-8学习环境。阿斯本社区学校成立于1970年,是一所特许学校,它为学生提供的教育注重经验的多样性、表达的自由和对孩子内在好奇心的信任。

The Aspen Community School offers a unique and stimulating K-8 learning environment surrounded by the mountain landscape of Woody Creek, Colorado. Established as a charter school in 1970, ACS provides its students with an education focused on a diversity of experiences, freedom of expression and trust in a child’s intrinsic curiosity.

阿斯本社区学校拥有咆哮谷的360度景观,包括一个完全融入场地的新教室和社区建筑以及一个新的体育馆。学校管理层、学生和整个社区在设计过程中发挥了重要作用,以实现最佳的学习环境,同时反映其独特的特征和历史。反映周围景观颜色的材料使建筑与场地融为一体。

With 360 degree views of the Roaring Fork Valley, the Aspen Community School includes a new classroom & community building that is fully integrated into the site and a new gymnasium. The school administration, the students, and the community at large have been instrumental in the design process to achieve the optimal learning environment while reflecting on its unique character and history. Materials which reflect the colors of the surrounding landscape ground the architecture to the site. into the site.

场地和景观的改善使车辆/行人的通行更加安全,游戏区得到加强,校园和社区的感觉得到加强。在这个农村地区,大量的场地设施升级也已经实现。

Site and landscaping improvements result in safer vehicular/pedestrian circulation, enhanced play areas and a reinforced sense of campus and community. Substantial site utility upgrades to this rural site have also been realized.

Studio B Architecture + Interiors(设计建筑师)和Cuningham Group(备案建筑师)指导了一个合作过程,以实现校园设施支持创新学习,加强学校的文化和历史身份,并舒适地融入现有校园的自然景观。

Studio B Architecture + Interiors (the Design Architect) and Cuningham Group (Architect-of- Record) directed a collaborative process to achieve campus facilities that support innovative learning, that reinforce the cultural and historical identity of the school, and that fit comfortably in the natural landscape of the existing school campus.

学校管理层、教师、学生、家长和整个社区在设计过程中发挥了重要作用,包括许多小组工作会议、定期的设计咨询小组会议和频繁的公开演讲。这种建立共识的努力的结果是实现了学校的愿景和目标,满足了当前和未来的项目要求,是所有社区成员参与的真正产物。

The school administration, teachers, students, parents and the community at large were instrumental in the design process that included many small-group work-sessions, regular Design Advisory Group meetings, and frequent public presentations. The result of this consensus-building effort is a design that achieves the vision and goals of the school, satisfies the desired current and future programmatic requirements and is truly the product of all community members that participated.

Architects: Studio B Architecture + Interiors
Area : 19500 ft²
Year : 2015
Photographs :Greg Watts
Manufacturers : AutoDesk, Kalwall®, Sierra Pacific Windows, Graypants, Lumasite, Reclaimed Beetle Kill Colorado
Architect of Record : Cuningham Group
Structural Engineer : KL&A, Inc.
Interior Designer : Cuningham Group Architecture
Contractor : Evans Chaffe Construction Group
Architect In Charge : Studio B Architects + Cuningham Group
Architect : Studio B Architecture + Interiors
Mep/ Fp Engineer : BG Buildingworks
Landscape Architect : Shannon Murphy
Lighting Designer : BG Buildingworks
Construction Manager : Chris Penney
Mep Engineer : BG Buildingworks
Fire Protection : BG Buildingworks
City : Snowmass
Country : United States