在这个项目中,我们为里贝朗普雷图共享燃料基地制作了一个新的办公大楼。该建筑分两层开发。上层有12个商业房间、接待处和浴室,下层有生活区、技术区和储藏室–此外还有一个计划用于未来扩展的有盖区域。

For this project, we made a new office building for the Ribeirão Preto Shared Fuel Base. The building is developed on two floors. The upper floor has 12 commercial rooms, reception, and bathrooms, and the lower floor, has a living area, technical area, and storage – in addition to a covered area planned for future expansion.

为该建筑预留的区域就在建筑群的入口处,在一块三角形的土地上,位于现有办公楼和进入作业区的卡车车道之间的斜坡上。除了地形的不规则性,该项目还有其他最初的制约因素,如预先存在的随机分布在土地上的大树,太阳在该地点的入射率,导致现有房间的视觉眩光,以及有限的预算。考虑到所有的限制因素,根据影响房间的日照和建筑与周围环境的关系,确定了建筑在土地上的植入方式。

The area reserved for the building was right at the entrance to the complex, at a triangular piece of land, on a slope between the existing office building and a lane for trucks entering the operational area. In addition to the terrain’s irregularity, the project had other initial constraints, such as the pre-existence of large trees spread randomly across the land, the sun’s incidence on the site, which causes visual glare in the existing rooms, and a limited budget. All constraints considered, the implantation of the building on the land was defined based on the insolation that would affect the rooms and the relation that the building would have with its surroundings.

选择的结构是预制的混凝土。作为一种设计方案,我们保持了结构的明显性,并通过工业建筑来改善其美感。建筑物的柱子向体量的前方伸出,与上部的梁一起,成为立面门廊的特征。门廊也有助于减少阳光直射到房间里。

The structure chosen was prefabricated concrete. As a design option, we kept the structure apparent and improved its aesthetics with industrial architecture. The pillars of the building project towards the front of the volume which, together with the upper beams, characterize the porticoes of the façade. The porticoes also contribute to reducing direct sunlight in the rooms.

作为设计的前提,我们致力于解决广场和花园区域与建筑之间的关系,特别是其公共区域,以扩大空间的感知,并与周围的绿色植物进行更愉快的整合。为了组成广场,现有的绿色植物被重新安置,楼层设计自然出现,引导已有的路径,和谐地适应广场的地形。在燃料基地创建绿化区和生活区,以改善员工的日常生活,这是一种开创性的做法。

As a design premise, we worked on the relationship between the square and garden areas with the building, especially its communal areas, in order to broaden the perception of space and make a more pleasant integration with the surrounding greenery. The existing greenery was relocated in order to compose the square, and the floor design emerged naturally, guiding the paths that already existed and adapting harmoniously to the square’s topography. The creation of a green area and living areas at a fuel base to improve the daily lives of employees was pioneering.

在一楼,公共区域的布局是用灵活的家具设计的,这样就可以根据用途和需要来改变和重新安排布局。

On the ground floor, the layout of the common areas was designed with flexible furniture so that changes and rearrangements of the layout could be made according to uses and needs.

在一楼,分布着各房间流线的走廊获得了天顶照明–创造了一种宽敞的感觉–和一个金属板条的天花板,它过滤了这种照明并引导进入大楼的路人流线。

On the first floor, the corridor that distributes the flow of the rooms gained zenith lighting – creating a feeling of spaciousness – and a slatted metal ceiling, which filters this lighting and guides the flow of passers-by entering the building.

Architects: Estúdio Cidade
Area : 11410 ft²
Year : 2020
Photographs :Keniche Santos
Manufacturers : CB metal, Cia Luz, Cremme, DVB vidros, Ecodomos, Fernando Jaeger design, Líder Interiores, Marmoraria Sertanezina, Matisse marcenaria, Portobello Shop, Sulmetais, Tecnogran, Tidelli
Projeto Arquitetônico : Maísa Deghaidi Jordão
Paisagismo : Maísa Deghaidi Jordão
Interiores : Maísa Deghaidi Jordão
Gerenciamento De Obra : Maísa Deghaidi Jordão
Prefabricated Structure Consulting : Fabio Mosaner
Visual Communication Project : Martina Hotzel
Electrical Hydraulic And Fire Project : Corelo Chaves
Pre Molded Structure : Marka soluções pré-fabricadas
Pergola Metal Structure : Mundial Estruturas Metálicas
Civil Electrical And Hydraulic Part : Attico Engenharia
Fire Infrastructure : Riberfire
Covering Structure And Tiles : Teto Prático
Lightining : Cia Luz Iluminato Design
Visual Communication : Colormidia
Execution Of External Floors : TCO construtora